Project archive 2011-2012

SERVICES PROVIDED:
 
 
I. INTEGRATED ENVIRONMENTAL STUDIES, AND DEVELOPMENT OF EIA AND  ENVIRONMENTAL PROTECTION MEASURES (EPMB) OF CONSTRUCTION PROJECT DOCUMENTATION FOR DIFFERENT INDUSTRIES
 
Adjustment of Section Environmental protection Measures (EPMB) for Facility «Combined (highway/railway) Adler - Alpine Alpica Service Resort». Stage 1-28.
Customer – OAO «SIBGIPROTRANS»,  2011-2012
Disturbed Soil Remediation Project for Facility «Combined (highway/railway) Adler - Alpine Alpica Service Resort». Stage 1-28.
Customer – OAO «SIBGIPROTRANS» - branch of open society «ROSZHELDORPROEKT», 2011 - 2012

Environmental protection Measures (EPMB) for Facility «External Railway Transport for Taman Oil Terminal».
Krasnodar Territory, Temryuk District.
Customer - LLC «YUGTERMINALPROEK», 2011

EIA within the Project: «Land Leveling in Upgrade of BALTIMOR airfield».
City of Voronezh, 2011
EIA within the Project: «Facility Territory Leveling to set up a Complex 1st Grade Air Base in Military Town No 2 Territory».
Town of Krymsk, Krasnodar Territory, 2011
EIA within the Project to plan the land for the Facility «To upgrade the naval aviation training center including the land trial and ship-based aviation exercise-and-trial complex».
Town of Yeisk, Krasnodar Territory, 2011
Customer - OAO «GIPROGOR»

Environmental protection Measures (EPMB) for «the Tunnel No. 4 at Tuapse-Adler section of the North-Caucasian Railway», 2011
Developing a detailed design to remediate the disturbed soil for «the Tunnel No. 4 at Tuapse-Adler section of the North-Caucasian Railway», 2012
Customer – OAO Research and Design Institute «LENMETROGIPROTRANS»
 
EIA and EPMB Measures including the estimates of damage to biological resources and modeling the flows in work areas for the Facility «To construct the Facility «Kozmino» of SpecMorNeftePort Federal Ownership».
Operational waters of Mooring No 2 in the Bay of Kozmino, 2011-2012
Customer – ZAO «GT MORSTROY»
 
II. DEVELOPMENT OF DRAFT REGULATIONS OF MAXIMUM PERMISSIBLE EMISSIONS (MPE), MAXIMUM PERMISSIBLE DISCHARGE (MPD), DISPOSAL OF WASTE, JUSTIFICATION OF USE OF NATURAL RESOURCES, MATHEMATICAL MODELLING
 
Calculations of planned payments for contamination of environment for the administrative building company «AK «Transneft» and getting approval of these estimates from the regulatory authorities.
Customer - JSC «AK «TRANSNEFT», 2011-2012
 
Adjustment and approval of the draft standards of waste formation and limits on their disposal for the administrative building company «AK «Transneft», 2012
Customer – JSC «GIPROTRUBOPROVOD»; Pipeline Design Institute

Development of the «Project of sanitary-protective zone (sanitary gap)» for Facility «External Railway Transport» of Taman Oil Terminal.
Krasnodar Territory, Temryuk District, 2011
Customer – LLC «YUGTERMINALPROEK»
 
III. ENVIRONMENTAL CONSULTING
 
Consulting service fir the Facility «Combined (highway/railway) Adler - Alpine Alpica Service Resort». Stage 10.
Customer – OAO RUSSIAN RAILWAYS, 2012

Assessment and monitoring the certification process for «Olympic Park» Railway Station for compliance to the PASS Level of International Standard BREEAM BESPOKE of Facility «Combined (highway/railway) Adler - Alpine Alpica Service Resort», 2011-2013
Customer – «SIBGIPROTRANSPUT» – Branch OAO «ROSZHELDORPROEKT»

Consulting services in environmental legislation, 2010-2015
Analytical survey of Russian Legislation done for Citation Co, 2011 - 2012
Customer – ANTEA GROUP (State Minnesota, USA)

Environmental consulting services for the CPC Facility Extension, 2012-2013
Customer – SHEVRON-NEFTEGAZ-INK (Russian branch)
 
IV. SITE AND ENVIRONMENTAL SURVEYING
 
Engineering-and environmental survey for Facility «External Railway Transport for Taman Oil Terminal».
Krasnodar Territory, Temryuk District, 2011
Customer – LLC   «YUGTERMINALPROEKT»

Engineering-and environmental survey for Facility «Tunnel No. 4 at Tuapse-Adler section of the North-Caucasian Railway», 2011-2012
Customer – OAO Research and Development Institute «LENMETROGIPROTRANS»
 
V. ENVIRONMENTAL AUDIT
 
Executing a pre-sale environmental survey of Facility Bogorodskneft, 2011
Environmental audit of oil refinery ZAO ‘VNKHK’ owned by Rosneft in the town Nakhodka, 2012
Customer – «KBC ENVIRONMENTAL LIMITED», (UK)

Environmental audit of a territory to extend the production facility «Michelin – Russian Tire Manufacturer», 2011 -2012
Moscow Region, Orekhovo-Zuevo Region, village of Davydovo, 2011-2012
Customer  - HANS PIKEL CONSULTING, (France)
 
Environment audit at plants of Company «Oracle».
Town of Saint-Petersburg, 2012
Environment audit at facilities of Company «Delphi EEA» in Sergieev District of Samara  Region, 2012
Environment audit of AvtoVAZ facilities.
Town of Togliatti, Samara region and the city of Izhevsk, Republic of Udmurtia, 2012-2013
Environment audit of a piece of land of LLC «Orggsintez».
Town of Novomoskovsk, Tula region, 2012
Customer – ANTEA GROUP (State Minnesota, USA), ANTEA GROUP (France)

Vernadsky Avenue 94, Building 1, of.6,7,9,
Moscow, Russia, 119571
tel. +7 (499) 503-93-93, 503-93-83, +7 (495) 646-31-01
fax +7 (499) 503-93-93, 503-93-83,
e-mail ec@ecifpa.ru
© 2024 «Environmental Centre IFPA»
Made by iCom